Files
deerflow-code/offline-backend-20260512/backend/docs/multiturn-probe-langchain-1.2.15.json

156 lines
5.9 KiB
JSON

{
"model": "MiniMax-M2.7",
"trigger_messages": 8,
"keep_messages": 2,
"rows": [
{
"turn": 1,
"compression": "passthrough",
"history_messages": 2,
"has_cache": false,
"visible": "已记住",
"elapsed_seconds": 4.78,
"summary_updated": false
},
{
"turn": 2,
"compression": "passthrough",
"history_messages": 4,
"has_cache": false,
"visible": "已记住。",
"elapsed_seconds": 3.19,
"summary_updated": false
},
{
"turn": 3,
"compression": "passthrough",
"history_messages": 6,
"has_cache": false,
"visible": "已记住。",
"elapsed_seconds": 1.91,
"summary_updated": false
},
{
"turn": 4,
"compression": "passthrough",
"history_messages": 8,
"has_cache": false,
"visible": "已记住。",
"elapsed_seconds": 1.39,
"summary_updated": false
},
{
"turn": 5,
"compression": "summarize",
"history_messages": 10,
"has_cache": true,
"visible": "项目代号为ORBIT-42,预算为35万元,截止日期为2026年12月20日。",
"elapsed_seconds": 13.5,
"summary_updated": true,
"summary_text": "## SESSION INTENT\nSet up and remember project ORBIT-42 parameters for future reference in this session.\n\n## SUMMARY\n- Project Code: ORBIT-42\n- Budget: 35万元 (350,000 RMB)\n- Deadline: 2026-12-20\n- Scope: System must support information retrieval, Q&A functionality, and report export\n- Constraint: Real customer data cannot be uploaded; only synthetic test materials may be used\n- Acceptance Criteria: Must verify reference sources, output format compliance, and interface stability\n\n## ARTIFACTS\nNone created or modified.\n\n## NEXT STEPS\nProject parameters are stored. Awaiting further instructions on ORBIT-42 project implementation."
},
{
"turn": 6,
"compression": "reuse",
"history_messages": 12,
"has_cache": true,
"visible": "已更新。",
"elapsed_seconds": 1.62,
"summary_updated": false
},
{
"turn": 7,
"compression": "reuse",
"history_messages": 14,
"has_cache": true,
"visible": "已记住。",
"elapsed_seconds": 1.31,
"summary_updated": false
},
{
"turn": 8,
"compression": "summarize",
"history_messages": 16,
"has_cache": true,
"visible": "已更新。",
"elapsed_seconds": 9.2,
"summary_updated": true,
"summary_text": "## SESSION INTENT\nSet up and remember project ORBIT-42 parameters for future reference in this session.\n\n## SUMMARY\n- Project Code: ORBIT-42\n- Budget: 48万元 (updated from 35万元)\n- Deadline: 2026-12-20\n- Scope: System must support information retrieval, Q&A functionality, and report export\n- Constraint: Real customer data cannot be uploaded; only synthetic test materials may be used\n- NEW Constraint: Reports must be in Chinese, conclusions first then basis\n- Acceptance Criteria: Must verify reference sources, output format compliance, and interface stability\n\n## ARTIFACTS\nNone created or modified.\n\n## NEXT STEPS\nProject parameters are stored. Awaiting further instructions on ORBIT-42 project implementation."
},
{
"turn": 9,
"compression": "reuse",
"history_messages": 18,
"has_cache": true,
"visible": "已记住。",
"elapsed_seconds": 2.24,
"summary_updated": false
},
{
"turn": 10,
"compression": "reuse",
"history_messages": 20,
"has_cache": true,
"visible": "已记住。",
"elapsed_seconds": 1.67,
"summary_updated": false
},
{
"turn": 11,
"compression": "summarize",
"history_messages": 22,
"has_cache": true,
"visible": "已记住。",
"elapsed_seconds": 10.02,
"summary_updated": true,
"summary_text": "## SESSION INTENT\nSet up and remember project ORBIT-42 parameters for future reference in this session.\n\n## SUMMARY\n- Project Code: ORBIT-42\n- Budget: 48万元\n- Deadline: 2026-12-28 (updated from 2026-12-20)\n- Scope: System must support information retrieval, Q&A functionality, and report export\n- Constraint: Real customer data cannot be uploaded; only synthetic test materials may be used\n- Constraint: Reports must be in Chinese, conclusions first then basis\n- Acceptance Criteria:\n - Must verify reference sources\n - Output format compliance\n - Interface stability\n - Must cover multi-turn Q&A and long documents\n - Must retain test reports, cannot delete existing chat records\n\n## ARTIFACTS\nNone created or modified.\n\n## NEXT STEPS\nProject parameters are stored. Awaiting further instructions on ORBIT-42 project implementation."
},
{
"turn": 12,
"compression": "reuse",
"history_messages": 24,
"has_cache": true,
"visible": "```json\n{\n \"code\": \"ORBIT-42\",\n \"budget\": 48,\n \"deadline\": \"2026-12-28\"\n}\n```",
"elapsed_seconds": 3.62,
"summary_updated": false
}
],
"fact_check": true,
"summary_rounds": [
5,
8,
11
],
"reuse_rounds": [
6,
7,
9,
10,
12
],
"outcome": "passed",
"elapsed_seconds": 54.53,
"tested_dependency_versions": {
"langchain": "1.2.15",
"langchain-anthropic": "1.4.1",
"langchain-core": "1.3.2",
"langchain-deepseek": "1.0.1",
"langchain-google-genai": "4.2.2",
"langchain-mcp-adapters": "0.2.2",
"langchain-openai": "1.2.1",
"langchain-protocol": "0.0.12",
"langfuse": "4.5.1",
"langgraph": "1.1.9",
"langgraph-api": "0.8.1",
"langgraph-checkpoint": "4.0.2",
"langgraph-checkpoint-postgres": "3.0.5",
"langgraph-checkpoint-sqlite": "3.0.3",
"langgraph-cli": "0.4.24",
"langgraph-prebuilt": "1.0.11",
"langgraph-runtime-inmem": "0.28.0",
"langgraph-sdk": "0.3.13",
"langsmith": "0.7.36",
"lark-oapi": "1.5.5"
}
}